Pipeline Work

Share
twitterlinkedinfacebook
Image 16 of 42
< Prev Next >
ae ROW clearing 2010 054.jpg
The right of way has to be leveled and cleared prior to the pipeline being installed.  The top soil is graded to one side so it can be spread back over the ROW after the pipe has been covered.