Pipeline Work
ae ROW clearing 2010 054.jpg


The right of way has to be leveled and cleared prior to the pipeline being installed. The top soil is graded to one side so it can be spread back over the ROW after the pipe has been covered.
Trudie Bell 4 Aug 2010 3008x2000 / 5.2MB